Station 13 · 02 Module Stacking & Welding

Module EOL Tester

Tests insulation, withstand voltage, total voltage & resistance, and continuity.

Module EOL Tester
Renderings from the proposal; delivered equipment may differ
Insulation test
DC 1000 V, ≥ 500 MΩ
Withstand test
DC 2800 V, leakage ≤ 10 mA

Updated

What it does

  • Tests insulation, withstand voltage, total voltage & resistance, and continuity.
  • On arrival the pallet lifts, probes descend and testing starts automatically.

Design features

  • Modular build with integrated conveyor and aviation connectors

Key parameters

Insulation testDC 1000 V, ≥ 500 MΩ
Withstand testDC 2800 V, leakage ≤ 10 mA

Where it sits on the line

13 Module EOL test

01Cell Processing3 operators01 Full-pallet cell infeed · Manual0102 Robotic depalletizing · Auto0203 Barcode scan / OCV test · Auto0304 NG reject / OK refill · Auto0405 Cell flipping & grouping · Auto0506 Cell adhesive application · Manual0602Module Stacking & Welding6 operators07 Module stacking & pressing · Semi-auto0708 Terminal addressing · Auto0809 NG rejection · Auto0910 CCS / busbar placement · Manual1011 Busbar laser welding · Auto1112 Post-weld cleaning & inspection · Manual1213 Module EOL test · Auto1314 Module transfer · Manual1403PACK Assembly & Test12 operators15 Cooling-plate infeed · Manual1516 Cooling-plate leak test · Semi-auto1617 Lower-housing thermal adhesive dispensing · Auto1718 Module boxing · Manual1819 PACK assembly stations · Manual1920 PACK test stations · Semi-auto2021 Finished PACK offload · Manual2101Cell Processing3 operators01 Full-pallet cell infeed · Manual0102 Robotic depalletizing · Auto0203 Barcode scan / OCV test · Auto0304 NG reject / OK refill · Auto0405 Cell flipping & grouping · Auto0506 Cell adhesive application · Manual0602Module Stacking & Welding6 operators07 Module stacking & pressing · Semi-auto0708 Terminal addressing · Auto0809 NG rejection · Auto0910 CCS / busbar placement · Manual1011 Busbar laser welding · Auto1112 Post-weld cleaning & inspection · Manual1213 Module EOL test · Auto1314 Module transfer · Manual1403PACK Assembly & Test12 operators15 Cooling-plate infeed · Manual1516 Cooling-plate leak test · Semi-auto1617 Lower-housing thermal adhesive dispensing · Auto1718 Module boxing · Manual1819 PACK assembly stations · Manual1920 PACK test stations · Semi-auto2021 Finished PACK offload · Manual21
AutoSemi-autoManual21 stations · 55 m · 21 operators

Put 55 metres of line
into your plant.

Share your cell spec, module design and plant constraints. Our engineers will come back with a layout and configuration.