Station 17 · 03 PACK Assembly & Test

Lower-Housing Thermal Adhesive Dispenser

Dispenses thermal structural adhesive on the housing floor before modules are boxed.

Lower-Housing Thermal Adhesive Dispenser
Renderings from the proposal; delivered equipment may differ
Vision accuracy
± 0.2 mm
Path accuracy
± 2 mm
Volume accuracy
5 %

Updated

What it does

  • Dispenses thermal structural adhesive on the housing floor before modules are boxed.
  • After lift-and-locate, a 3-axis system images datum features, then dispenses along the corrected path.

Design features

  • Vision compensates path deviation
  • Pressure and volume data to MES via Profinet and more
  • Dual-servo metering with live pressure curve

Key parameters

Vision accuracy± 0.2 mm
Path accuracy± 2 mm
Volume accuracy5 %

Where it sits on the line

17 Lower-housing thermal adhesive dispensing

01Cell Processing3 operators01 Full-pallet cell infeed · Manual0102 Robotic depalletizing · Auto0203 Barcode scan / OCV test · Auto0304 NG reject / OK refill · Auto0405 Cell flipping & grouping · Auto0506 Cell adhesive application · Manual0602Module Stacking & Welding6 operators07 Module stacking & pressing · Semi-auto0708 Terminal addressing · Auto0809 NG rejection · Auto0910 CCS / busbar placement · Manual1011 Busbar laser welding · Auto1112 Post-weld cleaning & inspection · Manual1213 Module EOL test · Auto1314 Module transfer · Manual1403PACK Assembly & Test12 operators15 Cooling-plate infeed · Manual1516 Cooling-plate leak test · Semi-auto1617 Lower-housing thermal adhesive dispensing · Auto1718 Module boxing · Manual1819 PACK assembly stations · Manual1920 PACK test stations · Semi-auto2021 Finished PACK offload · Manual2101Cell Processing3 operators01 Full-pallet cell infeed · Manual0102 Robotic depalletizing · Auto0203 Barcode scan / OCV test · Auto0304 NG reject / OK refill · Auto0405 Cell flipping & grouping · Auto0506 Cell adhesive application · Manual0602Module Stacking & Welding6 operators07 Module stacking & pressing · Semi-auto0708 Terminal addressing · Auto0809 NG rejection · Auto0910 CCS / busbar placement · Manual1011 Busbar laser welding · Auto1112 Post-weld cleaning & inspection · Manual1213 Module EOL test · Auto1314 Module transfer · Manual1403PACK Assembly & Test12 operators15 Cooling-plate infeed · Manual1516 Cooling-plate leak test · Semi-auto1617 Lower-housing thermal adhesive dispensing · Auto1718 Module boxing · Manual1819 PACK assembly stations · Manual1920 PACK test stations · Semi-auto2021 Finished PACK offload · Manual21
AutoSemi-autoManual21 stations · 55 m · 21 operators

Put 55 metres of line
into your plant.

Share your cell spec, module design and plant constraints. Our engineers will come back with a layout and configuration.